Licence No.: 2533
Licence Issued: December 14, 2001
IN ACCORDANCE WITH THE MANITOBA ENVIRONMENT ACT (C.C.S.M. c. E125)
THIS LICENCE IS ISSUED PURSUANT TO SECTION 11(1) TO:
MANITOBA HYDRO; "the Licencee"
for the construction, operation and maintenance of the Development known as the
Brereton Lake 124-12 kV Station located in Pt. 29 and 32-11-15 EPM in the Whiteshell
Provincial Park, north of PTH 44, west of PR 307 and south of the existing Seven Sisters
to Kenora (SK 1) transmission line, in accordance with the Proposal filed under The
Environment Act dated October 12, 2001 and subject to the following specifications,
limits, terms and conditions:
DEFINITIONS
In this Licence,
"wetlands" means those areas where the water table is at or above the
land surface for a long enough period each year to make the area capable of supporting
aquatic or hydrophilic vegetation, and which have soils with characteristics indicative of
wet conditions;
"A-weighted sound level" means the sound level measured in dB with a
sound level meter set on the A-weighting network; a filter designed to approximate the
relative sensitivity of the normal human ear to different frequencies of sound. The unit
of measurement is denoted dBA;
"dB (decibel)" means a dimensionless measure of sound level or
sound pressure level, where,
sound level = 20 log10 of {sound pressure (actural)}/{sound pressure
(reference)};
"dBA" means a denotation used to indicate a unit of sound measurement;
"Leq(1)" means the Leq level for a 1 hour period; and
"Leq (Lequivalent)" means the equivalent A-weighted sound level and is
the intensity (dBA) of the constant or steady sound level that would result in exposure to
the same total A-weighted energy as would the specified time varying sound, if the
constant sound level persisted over an equal time interval.
GENERAL TERMS AND CONDITIONS
This Section of the Licence contains requirements intended to provide guidance to the
Licencee in implementing practices to ensure that the environment is maintained in such a
manner as to sustain a high quality of life, including social and economic development,
recreation and leisure for present and future Manitobans.
- The Licencee shall, prior to construction startup, arrange a pre-construction meeting
with representatives of Manitoba Conservation Eastern Region staff in Lac du Bonnet in
order to ensure ongoing compliance with this Licence during construction and salvage
activities associated with the Development.
- The Licencee shall, prior to construction, obtain a Work Permit and a Timber Permit for
the construction and salvage work related to the Development.
- The Licencee shall, prior to construction, provide a copy of this Licence and related
permits to each contractor involved in the construction of the Development.
- The Licencee shall, during construction, ensure that any fuel storage areas established
for the construction of the Development are located a minimum distance of 100 meters away
from waterbodies including wetlands and that the storage areas comply with the
requirements of Manitoba Regulation 97/88R - Storage and Handling of Gasoline and
Associated Products.
- The Licencee shall ensure that all used petroleum products and other hazardous wastes
generated by the machinery used in the construction and operation of the Development are
collected and disposed of in accordance with Manitoba Conservation and legislative
requirements.
- The Licencee shall ensure that non-reusable demolition and construction debris from the
Development is disposed of at a waste disposal ground operating under the authority of a
permit pursuant to the Waste Disposal Ground Regulation, MR 150/91.
- The Licencee shall ensure during construction, operation and maintenance of the
Development that spills of petroleum or other contaminants are reported to an Environment
Officer in accordance with the requirements of Manitoba Regulation 439/87
respecting Environmental Accident Reporting.
SPECIFICATIONS, LIMITS, TERMS AND CONDITIONS
- The Licencee shall, during construction and salvage activities related to the
Development, adhere to the Department of Conservation Forest Damage Appraisal and
Valuation policy with respect to timber removal and forest damage. Clearing and use of
new access trails and borrow pits areas shall require prior approval of Manitoba
Conservation, Eastern Region in Lac du Bonnet.
- The Licencee shall minimize clearing existing vegetation within and adjacent to the
station site property to decrease erosion potential and to provide a visual buffer from
the station.
- The Licencee shall, prior to commencement of construction activities for the oil
containment facilities at the Development, submit to the Director, the results of an Oil
Containment Assessment. Oil containment Plans and Specifications, as recommended in the
Oil Containment Assessment for the protection of groundwater shall be approved by the
Director prior to the commencement of construction of the oil containment facilities.
- The Licencee shall construct and install the oil containment equipment as described in
the Plans and Specifications approved by the Director as required pursuant to Clause 10 of
this Licence.
- The Licencee shall not cause or permit emission of sound from the station, which, when
measured beyond the property line of the station in a residential area, exceeds an hourly
equivalent [Leq(1)] sound level of 45 dBA during the hours of 11:00 p.m. to 7:00 a.m.
local time.
- The Licencee shall, prior to salvaging the existing Rennie and White Lake Transformer
Station sites, determine acceptable levels of any PCB contaminated soils tested from the
station sites based on current CCME guidelines. Manitoba Conservation, Eastern Region,
shall be notified of any plans for disposal of contaminated soils prior to disposal of the
soils.
- The Licencee shall use wood poles treated with chromated copper arsenate (CCA) where
wood structures are used in wetland areas related to the Development.
REVIEW AND REVOCATION
- If, in the opinion of the Director, the Licencee has exceeded or is exceeding or has or
is failing to meet the specifications, limits, terms, or conditions set out in this
Licence, the Director may, temporarily or permanently, revoke this Licence.
- If, in the opinion of the Director, new evidence warrants a change in the
specifications, limits, terms or conditions of this Licence, the Director may require the
filing of a new proposal pursuant to Section 11 of The Environment Act.
"original signed by"
Larry Strachan, P. Eng.