| Disclaimer: Please
ensure that JavaScript is turned on the view and/or calculate the below spreadsheet.
Enter information in the boxes with the * then press the calculate link
at the bottom of the forms.
|
|
|
Explanatory Notes |
|
|
|
PART A - NET REVENUE CALCULATION OIL PRODUCTION
 
|
Number of Non Abandoned Wells: |
|
Enter no. of non-abandoned wells for which the company is the licensee |
|
|
Enter average calendar-day oil production for the last 6 months |
REVENUE
|
|
|
Enter average crude oil sales price for last 6 months |
|
|
6-month net revenue is automatically calculated as 60% of gross production revenue |
|
|
12-month net revenue is automatically calculated as 60% of gross production
revenue |
PART B - ABANDONMENT & REHABILITATION COSTS WELL
ABANDONMENT COSTS
|
|
|
Enter no. of non-abandoned wells with no downhole problems |
Average well abandonment cost: |
|
Enter average well abandonment cost |
Number of known "Problem" wells: |
|
Enter no. of non-abandoned wells with downhole problems |
Average "Problem" well abandonment cost: |
|
Enter average "Problem" well abandonment cost |
Total salvage value of surface and downhole equipment: |
|
Enter the total salvage value of surface and downhole equipment |
Total Well Abandonment cost: |
|
Spreadsheet calculates total well abandonment costs |

FACILITY ABANDONMENT COSTS

|
|
|
Enter no. of non-abandoned batteries |
Average battery abandonment cost: |
|
Enter average battery abandonment cost |
Total salvage value of battery equipment: |
|
Enter the total salvage value of battery equipment |
Total battery abandonment costs: |
|
Spreadsheet calculates total battery costs |
REHABILITATION COSTS
|
Number of wells requiring a COA: |
|
Enter no. of abandoned and non -abandoned wells requiring a Certificate of Abandonment
(COA) |
Average well rehabilitation cost: |
|
Enter average well rehabilitation cost |
Number of batteries requiring a COA: |
|
Enter no. of abandoned and non-abandoned batteries requiring a Certificate of
Abandonment (COA) |
Average battery rehabilitation cost: |
|
Enter average battery rehabilition cost |
Total rehabilitation costs: |
|
Spreadsheet calculates total rehabilitation costs |
 |
TOTAL ABANDONMENT &
REHABILITATION COSTS:
|
|
Sum of abandonment and rehabilitation costs
|
PART C - PERFORMANCE DEPOSIT CALCULATION
|
Total abandonment & rehabilitation costs: |
|
Sum of abandonment and rehabilitation costs from Part B |
Difference from 6 month net revenue: |
|
|
Difference from 12 month net revenue: |
|
|
Actual production time needed to offset abandonment costs: |
|
|

DEPOSIT REQUIRED

|
Calculated performance deposit: |
|
|
Drilling and Production Regulations Section 10(2): |
|
|
|