Manitoba
Printer Friendly

Manitoba Water Stewardship

To view PDF files, you must have a copy of the Adobe Acrobat Reader which is available as a free download.

Get  Acrobat Reader

Surface Water Project Requirements

Prior to construction of any works relative to your project you must contact the Water Licensing Branch at 945-6474 for requirements specific to your project.

Requirements for a surface water source project may include the following:

  • retaining a professional engineer registered to practice in the Province of Manitoba to prepare a sketch of the project and/or a stamped plan of any water storage works
  • amount of water required daily and annually
  • number of hectares irrigated, including crop types and rotation plans
  • type and number of animals
  • proof of legal ownership/access to all lands affected by the project, including any pipeline routes
  • copy of municipal conditional use permit
  • copy of authorization issued under The Water Resources Administration Act
  • copy of Environment Act License
  • verify that project complies with Fisheries and Oceans Canada requirements
  • type of metering equipment
  • any other information that may be specific to project

Any license that may be issued for a project would be subject to withdrawals that do not adversely affect the water source or significantly interfere with other existing water users. A decision concerning issuing a license for a project would only be possible upon submission of the required information.

Application for Licence to Divert and Use Water (pdf format)