Livestock Water Supply

Climate Change and Environment

BMP 4700:
2025 Special Intake – Livestock Water Supply

1


Applications will be accepted on a first-come, first-served basis until available funding is allocated.
Program guidelines are new for this intake. Please review carefully to ensure eligibility before applying.
 


The 2025 Special Intake: Livestock Water Supply intake supports livestock producers in accessing new or expanding existing water supplies during prolonged periods of dry conditions.


Intake Information

The intake for this program is currently open; funding requests will be accepted on a first-come, first-served basis from August 21, 2025, until available funding has been allocated.

Eligible Applicants

This intake is exclusively for livestock producers in specific areas impacted by dry conditions.

To be eligible, livestock producers must:

The land location(s) for the project must be within a Municipality, Northern Affairs Community or First Nation within a Designated Region as identified by AAFC's 2025 Livestock Tax Deferral Provision. A list of Designated Regions is available on AAFC's website. If you are unsure of your eligibility, please contact us at agriculture@gov.mb.ca or 1-800-811-4411.

Beneficial Management Practice (BMP) Summary

Establish new or expand existing water supply for agricultural use by installing infrastructure.

  • Wells: drilling new or deepening/extending existing, plus test hole drilling, screening, casing, well caps, etc.
  • Dugouts: constructing new or rehabilitating existing dugouts.
  • Associated components and actions: purchase and installation of pipe, plumbing and electrical, trenching, earthworks, etc.
  • Permanent pipeline development: pipelines below the frost line OR shallow/above ground pipelines (pipelines above the frost line) that can be winterized, pipe, plumbing materials, trenching, earthworks, etc.

Eligible Expenses

The following type of expenses are eligible for funding:

Review the Program Guide for complete details on eligible and ineligible expenses.

Project Timeline

  • All projects shall start April 1, 2025, or later.
  • Project activities and all reports must be completed by December 12, 2025.

Cost Share Funding

Additional Information and Documents

Viewing Forms: left click on the file name below and the form will open in your web browser.

Completing Forms: to complete the Applicant Information Form and the Application Worksheet, right click on the file name below, select "Save link as" and save document to your desktop. Open document by selecting file name from desktop, ensuring that the document is being opened with Adobe. If there are any issues in opening the form(s), please ensure that you have installed the most up-to-date version of Adobe.

Terms and Conditions Program Guide Applicant Information Form Application Worksheet Sample Agreement Frequently Asked Questions