Projects In Design

Grassmere Creek on PTH 9

Summer 2019

Grassmere Creek on PTH 9 Newsletter Summer 2019 (PDF, 1630 KB) (This publication is available in alternate format upon request.)

PTH 59N Red River Floodway Bridge

Spring 2019

Red River Floodway Bridge at PTH 59N Newsletter Spring 2019 (PDF, 850 KB)

PTH 1W - Assiniboine River at St. Francois Xavier

Fall 2017

Assiniboine River Bridge at St. Francois Xavier Newsletter Fall 2017 (PDF, 2.9 MB)

PR 313 Winnipeg River Bridge

The materials presented during the public information sessions are now appended to the Public Consultation Report

Summer 2019

Fall 2018

Spring 2018

Summer 2017

Summer 2016 Spring 2015 December 2014

Engineering Service Provider Agreements

Procedures

Engineering Service Provider Registry