Projects In Design

Red River Floodway Bridge on PTH 59

Fall 2020

Spring 2019

PTH 1 and 1A Interchange Study

Winter 2020

Grassmere Creek on PTH 9

Summer 2019

 

Assiniboine River at St. Francois Xavier Bridge on PTH 1W

Fall 2017

Winnipeg River Bridge on PR 313

The materials presented during the public information sessions are now appended to the Public Consultation Report

Summer 2019

Fall 2018

Spring 2018

Summer 2017

Summer 2016

Spring 2015

December 2014

 


Engineering Service Provider Agreements

Procedures

Engineering Service Provider Registry