Archived Standard Construction Specifications
Starting March 2013, Infrastructure began online archiving of previous versions of the standard construction specifications below. Previous versions of a given specification can be viewed by clicking the version date in the "Date" column of the table. A black line document showing all revisions between successive versions of a specification and can be opened by clicking the links in the"Tracked Revisions" column of the table.
(All files in Adobe Acrobat PDF format)
        (I) interim specification      
| Index for Standard Construction Specifications  | Number | Date | Tracked Revisions | 
| General | |||
| Index for Comb Book | July 2020 | ||
| Bidding Procedures | 90 | February 2019 | February 2019 to June 2020 | 
| Bidding Procedures | 90 | November 2018 | November 2018 to March 2019 | 
| Bidding Procedures | 90 | June 2017 | June 2017 to November 2018 | 
| Bidding Procedures | 90 | May  2017 | |
| Bidding Procedures | 90 | February 2017 | |
| General Conditions | 100(I)  | February 2017 to February 2019 | |
| General Conditions | 100  | ||
| Construction Order General Conditions | 110 | ||
| Non Bonded General Conditions | 110(I) | February 2017 | |
| Provisions For: | |||
| Liquidated Damages | 130 | ||
| Liquidated Damages | 130(I)  | ||
| Interim Payments | 140 | ||
| Fuel Cost Adjustments | 160(I) | February 2017 | |
| Fuel Cost Adjustments | 160 | May 2012 | |
| Fuel Cost Adjustments | 160 | ||
| Weigh Scales | 170 | ||
| Field Laboratories | 180 | March 2002 | |
| Traffic | |||
| Traffic Control | 200(I) | November 2018 | November 2018 to February 2020 | 
| Traffic Control | 200 | February 2016 | February 2016 to November 2018 | 
| Traffic Control | 200 | ||
| Culverts | |||
| Jacking Culverts Through Embankments | 410 | ||
| Grading | |||
| Grading | 500 | ||
| Grading | 500(I) | February 2017 | February 2017 to March 2018 | 
| Seeding | 540(I) | ||
| Gravelling | |||
| Stockpiling Aggregates | 600 | ||
| Supplying and Depositing Aggregates | 610 | ||
| Base Course | |||
| Granular Base Course | 700 | ||
| Pavement | |||
| Bituminous Pavement and Recycled Bituminous Pavement | 800 | March 2002 | |
| Bituminous Pavement and Recycled Bituminous Pavement | 800(I) | March 2018 - December 2018 | |
| Bituminous Pavement and Recycled Bituminous Pavement | 800(I) | February 2017 | February 2017 to March 2018 | 
| Bituminous Pavement and Recycled Bituminous Pavement | 800(I)  | ||
| Bituminous Pavement and Recycled Bituminous Pavement | 800(I)  | December 2018 | December 2018 to August 2019 | 
| Construction Specification for Bituminous Pavement | 801(I) | March 2020 | |
| Applying Prime Coat, Blotter Sand and Tack Coat | 805(I) | March 2018 | |
| Applying Prime Coat, Blotter Sand and Tack Coat | 805 | ||
| Applying Prime Coat, Blotter Sand and Tack Coat | 805(I) | February 2017 | February 2017 to March 2018 | 
| Concrete Pavement | 830 | July 2003 | |
| Micro Surfacing Treatment | 827(I) | February 2020 | |
| Micro Surfacing Treatment | 827(I) | January 2019 | January 2019 to February 2020 | 
| Concrete Pavement | 830(I)  | March 2015 - February 2017 | |
| Concrete Curbing | 860(I) | ||
| Aggregate | |||
| For Portland Cement Concrete | 930 | March 1986 | |
| For Granular Base Course | 900 | ||
| For Traffic Gravel | 910 | March  2002 | |
| For Bituminous Pavement | 920 | January  2008 | |
| for Bituminous Pavement | 920 | August 2015  | |
| For Seal Coat Cover | 940 | January  2001 | |
| Excavation | |||
| Structural Excavation | 1000(I)  | ||
| Demolition | |||
| Demolition and Removal of Existing Concrete Structures | 1020 M  | ||
| Dismantling and Salvaging of Existing Structures | 1021 M  | ||
| Miscellaneous | |||
| Approval, Supply and Application of Dust Control | 1280 | March 2011 | March 2011 to February 2019 | 


