No. of Spills |
Volume Spilled (m3) |
Volume per Spill (m3) |
Total Volume Produced (m3) |
Vol. Spilled as % Total Vol Prod. |
|
|
16 |
133.84 |
8.37 |
2580442.7 |
0.005 |
|
2 |
11 |
89.6 |
8.15 |
2432358.6 |
0.004 |
|
|
18 |
184.7 |
10.26 |
2566192.4 |
0.007 |
|
4 |
11 |
65.3 |
5.94 |
2672561.8 |
0.002 |
|
Total |
56 |
473.44 |
8.45 |
10251555.5 |
0.005 |
|
No. of Spills |
% of Total Spills |
Volume Spilled (m3) |
% of Vol. Spilled |
Vol. per Spill (m3) |
|
| Wellhead | 15 |
27 |
145.3 |
30.69 |
9.7 |
|
| Pipe Line/Flow Line | 18 |
32 |
107.44 |
22.69 |
6 |
|
| Battery Facilities | 9 |
16 |
97.6 |
20.62 |
10.8 |
|
| Tanks | 7 |
13 |
75.6 |
15.97 |
10.8 |
|
| Trucks | 2 |
4 |
3.9 |
0.82 |
2 |
|
| Headers | 5 |
9 |
43.6 |
9.21 |
8.7 |
|
| Total | 56 |
100 |
473.44 |
100 |